Granite Canal Hydro Electric Development
From Wikipedia, the free encyclopedia
The Granite Canal Hydroelectric Generating Station is located within Hydro’s Bay d’Espoir Hydro Electric Development system. The generating station has a rated capacity of 40 MW with an annual average energy production of 224 GWh. The generating unit at Granite Canal utilizes approximately 37 m of head with a rated plant flow of 122.4 m3 per second. The unit is equipped with a Kaplan turbine and was first synchronized on May 26, 2003.
As part of Hydro’s commitment to the environment, a 45,000 m2 fish habitat compensation facility was included in this development to ensure any aquatic habitat loss was avoided, reduced or replaced. A Fish Habitat Compensation Agreement was signed with the Federal Department of Fisheries and Oceans to ensure proper construction, utilization and long term viability of the facility.
This Newfoundland and Labrador-related article is a stub. You can help Wikipedia by expanding it. |