Geothermal power in Iceland

From Wikipedia, the free encyclopedia

Bjarnarflag Geothermal Station
Bjarnarflag Geothermal Station

Because of the special geological situation in Iceland with the high concentration of volcanoes, geothermal energy is very often used for heating and production of electricity. The energy is so inexpensive that in the wintertime, some sidewalks in Reykjavík and Akureyri are heated.

In Iceland, there are five major geothermal power plants which produce about 26% (2006) of the country's electricity. In addition, geothermal heating meets the heating and hot water requirements for around 87% of the nation's housing.

In the year 2006, 26.5 % of electricity generation in Iceland came from geothermal energy, 73.4 % from hydro power, and 0.1 % from fossil fuels. [1]

Consumption of primary geothermal energy in 2004 was 79.7 PJ, or 53.4% of the total national consumption of primary energy, 149.1 PJ. The corresponding share for hydro power was 17.2%, petroleum 26.3% and coal 3%. [2]

Geothermal borehole outside Reykjavik
Geothermal borehole outside Reykjavik

The first two of the following power plants produce both electricity and hot-water for heating purposes, whereas the other three produce only electricity.

  1. The Svartsengi Power-Plant, situated in the south-west of the country, near the International Airport at Keflavík on the Reykjanes peninsula. It currently produces 46,5 MW of electricity (with an expansion to 77 MW by 2007), and about 475 litres/second of almost boiling water (90 °C). Surplus mineral rich water from the plant fills up a nearby lake and popular tourist bathing resort Bláa Lónið (Blue Lagoon).
  2. The Nesjavellir Power-Plant, situated in the south of the country, near the lake Þingvallavatn and Hengill volcano. It currently produces 120 MW of electricity, and about 1600 litres/second of heating water.
  3. The Krafla Power-Plant, situated in the north-east corner of Iceland near lake Mývatn and the volcano Krafla - hence the name. It produces 60 MW of electricity, with an expansion to 90 MW on the drawing boards.
  4. The Reykjanes Power-Plant, situated in the south-western tip of the country (to the west of Svartsengi), went on line end of 2006, two turbines are producing 100 MW.
  5. The Hellisheiði Power-Plant, to the south of the Hengill volcano is being built, two turbines with together 90 MW went on line end of 2006. It is planed to reach 250 MW electricity and 400 MW of heating water by 2009.

[edit] See also

[edit] Notes

  1. ^ Energy Statistics in Iceland. Orkustofnun (Iceland Energy Authority). Retrieved on September 20, 2006.
  2. ^ Energy in Iceland - Historical Perspective, Present Status, Future Outlook. Orkustofnun (Iceland Energy Authority). Retrieved on September 20, 2006.