East Cornwall Mineral Railway

From Wikipedia, the free encyclopedia

East Cornwall Mineral Railway
Locale England
Dates of operation 1872 – 1894
Successor line Plymouth, Devonport and South Western Junction Railway
Track gauge 3 ft 6 in (1067 mm)
Length 8 miles
Headquarters Callington

The East Cornwall Mineral Railway was a narrow gauge industrial railway opened in 1872 to serve the iron ore and stone quarries around Callington in Cornwall.

The line was 712 miles long running from Kelly Bray to Calstock, where an incline ran down to the quay on the River Tamar. There were several branches serving copper, tin and arsenic mines and quarries.[1]

An Act of Parliament of 1883 authorised the Plymouth, Devonport and South Western Junction Railway to take over the line. The purchase was completed in 1894. The line was rebuilt to standard gauge, although for the period 1894 to 1908 it was dual gauged.[1]

[edit] Locomotives

Number Builder Type Date Works number Notes
1 Neilson and Company 0-4-0ST 1871 1660 Probably scrapped in 1907[2]
2 Neilson and Company 0-4-0ST 1871 1661 Converted to a standard gauge 0-4-2ST around 1907. Sold in 1912 and worked on the Selsey Tramway until scrapped in 1927[2]

[edit] References

  1. ^ a b Dart, Maurice (2005). Cornwall Narrow Gauge including the Camborne & Redruth tramway. Middleton Press. ISBN 190447456X. 
  2. ^ a b Callington Branch locomotives.

[edit] See also