Yerevan Metro
From Wikipedia, the free encyclopedia
The Yerevan Metro (Armenian: Երեւանի մետրոպոլիտեն, Erevani metropoliten; Russian: Ереванское Метро, Yerevanskoye Metro) is a rapid transit system that serves the capital of Armenia, Yerevan.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
edit |
Contents |
[edit] History
Yerevan, the capital of Armenia, experienced substantial growth during the postwar period when it was the capital of the Armenian SSR. Due to the city's very uneven landscape only an underground system could meet all of the criteria to efficiently move large numbers of people around the city. The first plans for a rapid transit system began to be formed in the late 1960s. Initially this was centred on a rapid tram system, rather than a full underground metro system. During this time, the Soviet City Engineering Planning Department clearly stated that a Metro system would only be awarded to cities with more than a population of one million, which Yerevan lacked at the start of construction (1972). Nevertheless, all of the tunnels in which the tram lines were to be built were built with a design that would have allowed a potential conversion into a full underground metro system.
By the end of 1978 over 4 kilometres of tunnels were already bored through, when the plans were redesigned so that the system would be opened as a full underground metro (although to avoid extra bureaucratic measures the system continued to be officially called "Rapid Tram" right up until its opening).
There is an anecdotical version of how the Soviet rules (more than 1 million, a full Metro system; less than million, a Tram system) were bypassed. Reportedly the Chairman of the Armenian Communist Party, Karen Demirchyan convinced the Soviet premier Leonid Brezhnev in the following manner: Technical problems with the construction of the Rapid Tram were allowed during planning when calculations were done about perspective passenger traffic. The root of which lies in the hearts of the Armenian people. Each Armenian who lives away from his or her parents must visit them daily. As a result the passenger flow will be at least 1.5 times greater than projected. Moreover the republic is growing and becoming more developed at an increasingly large amount, sooner or later many of the Armenian diaspora (which outnumber those living in the former Armenian SSR) will want to return home. In this case, by 2000 our capital will not have 1.5 million, but 2 million inhabitants. We need Metro!. (As of 2006, Yerevan has an actual population of just over 1 million.)
On 7 March 1981 the system was triumphantly opened, becoming the eighth Soviet Metro system, with a first four station stage of 7.6 kilometres. Since then, the system has grown to a 12.1 kilometre, 10 station network.
The engineering work was of such high quality that during the 1988 earthquake, which paralyzed the whole republic, although suffering some minor damage, the Metro managed to withstand the earthquake and continued to operate on the next day. However this did put an end to most of the extension projects as all the resources were diverted to reconstruction of the destroyed infrastructure elsewhere in Yerevan and Armenia.
On 28 December 1999, the Metro was named after Karen Demirchyan, the man who was responsible for changing the status of the Rapid Tram system into becoming a Metro system, after he was killed two months earlier in a terrorist attack on the Armenian parliament.
[edit] Timeline
Segment | Date opened |
---|---|
Barekamutiun-Sasuntsi David | March 8, 1981 |
Hanrapetutian Hraparak | December 26, 1981 |
Sasuntsi David-Gortsaranain | July 11, 1983 |
Gortsaranain-Shengavit | December 26, 1985 |
Shengavit-Garegin Njhdehi Hraparak | January 1, 1987 |
Zoravar Andranik | December 2, 1989 |
Shengavit-Charbakh | December 26, 1996 |
N.B Shengavit-Charbakh route is operated as a separate shuttle service.
[edit] Name changes
Station | Previous name(s) | Years |
---|---|---|
Marshal Baghramian | Saralandzhi | 1981-1982 |
Hanrapetutian Hraparak | Lenin Hraparak | 1981-1992 |
Garegin Njhdehi Hraparak | Spandaryan Hraparak | 1987-1992 |
Zoravor Andranik | Hoktemberyan | 1989-1992 |
[edit] Facts and numbers
Today the metro operates as a single line, with a shuttle branch and covers 12 kilometers, with trains running every five minutes from 6:30 a.m. till 11 p.m. The system employs about 1,200 workers. Due to Yerevan's uneven landscape, the metro in some cases goes above ground. Of the ten stations; seven are underground of which one is a single-vault shallow level, and the rest are pylon deep-level stations. Continuing the tradition of all ex-Soviet underground systems, most of the stations are exquisitely decorated, often blending Armenian national motifs with late-Soviet architecture.
When the system opened it initially had no depot, and service bays in the reversal sidings were used to make minor repairs instead. The proper depot Charbakh was opened in 1985 as part of the second extension. In the early 1990s the metro system had a total of 70 cars forming approximately 12 three-carriage trains. (All of 81-717/714 models) However since then the intermediate carriages were sold to the Moscow and Saint-Petersburg systems in return for overhaul repairs on the driving cars (which Charbakh has no facility or apparatus to perform). In 2000-2001, for economic reasons, all of the intermediate 81-714 carriages stopped operating and the system currently has only 13 81-717 two-carriage trains running, (12 on the main line, one on the shuttle service). The annual budget for Yerevan Metro in 2002 was 1 billion 440 million drams (about $2.5 million). Of this amount about 800 million drams was financed by the State. The rest of the budget was allocated from tickets costs, trade and advertisement. A ride on the Yerevan Metro currently costs 50 drams (about 10 cents).
[edit] Future plans
Despite the optimism of the growing city (which did reach one million in 1986), today the Metro is underfunded and does not form the main transport artery of the city. It has had practically no extensions since 1989 (albeit a small shuttle service to a single-platform station in Charbakh). In the city budget, which is still having to make provisions for the repair of the damage done in the horrendous 1988 earthquake, the metro clearly lacks any priority. All of the major works started in the late 1980s are currently frozen.
Moreover, since the Metro did not manage to connect the important residential districts before the earthquake and the economic crises that took place following the nation's declaration of independence, minibus routes currently have taken over as the backbone of Yerevan's urban transport, often doubling the Metro routes. In 2004 the annual ridership numbers were only 12.1 million, one of the lowest in the world. The optimistic opening date for the next extension Achapnyan and Nazaretyan (construction of which has been frozen since early 1990s) is 2011.
Although with the current building progress the future is very distant, there are plans for a second and third lines to eventually open, forming a typical Soviet triangle design layout of six radii, intersecting in the city centre.