Warszawska Kolej Dojazdowa
From Wikipedia, the free encyclopedia
Warszawska Kolej Dojazdowa (Warsaw Suburban Railway, WKD) is a suburban light rail line in Poland's capital city of Warsaw. The line, together with its two branches, links Warsaw with the municipalities of Michałowice, Pruszków, Brwinów, Podkowa Leśna, Milanówek and Grodzisk Mazowiecki to the south-west of Warsaw.
Contents |
[edit] History
The line was opened in 1927 as Elektryczna Kolej Dojazdowa (Electrical Suburban Railway), and was renamed to its current name in 1951. It was the first electric railway in Poland.
Previously a part of Polskie Koleje Państwowe (Polish State Railways, PKP), the line was acquired in late 2004 by a consortium made up of the city of Warsaw, the Masovian regional government and the six municipalities served by the line.[1]
[edit] Route
Starting from an underground terminus adjacent to the mainline Warszawa Centralna station, the line initially runs to the west alongside Warsaw's main east-west railway line before turning to the south-west on its own right of way. The stations are[2]:
- Warszawa Śródmieście WKD
- Warszawa Ochota
- Warszawa Zachodnia
- Warszawa Reduta Ordona
- Warszawa Aleje Jerozolimskie
- Warszawa Raków
- Warszawa Salomea
- Opacz
- Michałowice
- Reguły
- Malichy
- Tworki
- Pruszków WKD
- Komorów
- Nowa Wieś Warszawska
- Kanie Helenowskie
- Otrębusy
- Podkowa Leśna Wschodnia
- Podkowa Leśnia Główna
- Podkowa Leśna Zachodnia
Here the line splits into two branches. The stations on the Milanówek branch (line 48) are:
- Polesie
- Milanówek Grudów
The stations on the Grodzisk Mazowiecki branch (line 47) are:
- Kazimierówka
- Brzózki
- Grodzisk Mazowiecki Okrężna
- Grodzisk Mazowiecki Piaskowa
- Grodzisk Mazowiecki Jordanowice
- Grodzisk Mazowiecki Radońska
[edit] Operation
The WKD is standard gauge and electrified at 600 Volts DC on the overhead system. Train service is provided by two classes of train sets:
- Type EN94 six-axle articulated electric units, built from 1969 and normally operated in pairs. The line owns 40 of these units.
- Type EN95 ten-axle low-floor articulated electric units, built from 2004 and normally operated singly. The lines owns, or has on order, 13 of these units.
The line also possesses a historic type EN80 four-axle electric unit, built by English Electric at Preston in 1927, and a small diesel shunter, obtained second hand from PKP.[3][4]
On the main line, trains operate every 15 minutes at peak periods and every 30 minutes at other times, with a service gap between midnight and 05:00. For most of the day, one train an hour runs through to Milanówek Grudów, with most of the other trains running through to Grodzisk Mazowiecki Radońska. All trains stop at all stations on their route, and a journey from Warszawa Śródmieście to Grodzisk Mazowiecki Radońska takes just under one hour.[5]
The company's headquarters and the main technical depot are in Grodzisk Mazowiecki.
[edit] References
- ^ Railway dispute continues. European Industrial Relations Observatory. Retrieved on September 18, 2006.
- ^ WKD - Route Map. Warszawska Kolej Dojazdowa. Retrieved on September 18, 2006.
- ^ Rail Operators in Poland. railfaneurope.net. Retrieved on September 19, 2006.
- ^ WKD shunters and trainsets. railfaneurope.net. Retrieved on September 19, 2006.
- ^ Rozkład jazdy kolejki WKD Warszawa - Grodzisk Mazowiecki. Warszawska Kolej Dojazdowa. Retrieved on September 19, 2006.
[edit] External links
Wikimedia Commons has media related to: |
- WKD web site (in Polish)
This Polish rail-related article is a stub. You can help Wikipedia by expanding it. |