From Wikipedia, the free encyclopedia
[edit] Beschreibung
Description |
de PERI Schalungstechnik beim Bau der höchsten Brückenpfeiler der Welt, Viaduc de Millau, Frankreich, en PERI Formwork technology for the construction of the Highest Bridge Pier Worldwide, Viaduc de Millau, France
|
Source |
PERI Handbuch 2005 Schalung, PERI Handbook 2005 Formwork
|
Date |
2003
|
Author |
PERI GmbH
|
Permission |
Permission by PERI GmbH
|
[edit] Licensing
File links
The following pages on the English Wikipedia link to this file (pages on other projects are not listed):