Van Sweringen brothers
From Wikipedia, the free encyclopedia
Oris Paxton (24 April 1879–November 22, 1936, heart attack) and Mantis James (July 8, 1881–December 12, 1934) Van Sweringen were brothers who became railroad barons in order to develop Shaker Heights, Ohio. They are better known as O.P. Van Sweringen and M.J. Van Sweringen, or by their collective nickname, the Vans. The brothers came from a farming area near Wooster, Ohio. Their father was for a time an engineer in the oil fields of Pennsylvania and fought in the Civil War, receiving a wound at the Battle of Gettysburg. The family moved to Cleveland, Ohio in about 1890.
Neither brother married during his lifetime; the two shared a common bedroom in their fifty four room mansion Roundwood Manor on the grounds of their estate Daisy Hill in Hunting Valley, Ohio. During their lifetimes they seldom gave interviews or made appearances in public; however, when they did, it was always together. An overview of their accomplishments can not be done separately as the two were inseparable during their lives, and in their deaths they are buried together in Cleveland's Lakeview Cemetery.
Contents |
[edit] Real estate and Shaker Heights
Prior to the establishment of Shaker Heights, Ohio the brothers were land and building speculators in Cleveland, Ohio. After being employed by others, and after suffering several early business failures, the brothers entered the real estate business. In 1909 the Van Sweringen brothers began exercising options on 1,399 acres (5.7 km²) of land formerly owned by the North Union Community of the Society of Believers, better known as the Shakers. Conceived and planned as a garden community similar to Baltimore's Roland Park, Shaker Village soon became Cleveland's most sought after address. This was achieved through a combination of planning, design review and convenience - all of which fell under the strict supervision of the Vans.
Street planning for the new community used curved roads instead of the more usual grid pattern of streets found in many American communities. Three tree-lined boulevards extended eastward into the country. Moreland and Shaker Boulevard's center isles would be used for track bed for a planned interurban streetcar line. Both lines would share a common route from Cleveland through Shaker Square (recognized as the second modern planned shopping center) where they would divide onto their own routes. The Vans designated Shaker Boulevard as a grand boulevard of mansions, fronted by generous setbacks from the interurban tracks. Higher density luxury apartments were planned for Moreland Boulevard, which was renamed Van Aken Boulevard in honor of the city's first mayor.
Building in Shaker was controlled by a set of restrictive covenants and building guidelines established by the Vans known as Shaker Standards. Shaker Standards prevented the community from being developed in any way contrary to how the Vans intended. Standards limited commercial development, rental property development, and residence style and size. Standards set roof slope angles, materials, finishes, and garage placement. All residences were required to be unique and designed by an architect. Duplex residences in the community were restricted to designated areas, and were required follow guidelines designed to give the impression that structure was a single family home. By 1920 the Vans controlled over 4,000 acres (16 km²) in the community, which reached city status in 1931. Since lots sold slowly, the brothers concluded that Shaker Heights needed a transportation system between the suburb and downtown.
[edit] From trolley to Rapid to Terminal Tower
In 1913, the Vans had established the Cleveland Interurban Railroad, which managed the operation of their street car lines in what is now Cleveland Heights, Ohio. In order to provide convenience to residents of Shaker Heights, the Vans planned a high speed interurban styled electric rail line which was christened Shaker Heights Rapid Transit, commonly known as the Rapid. This prompted them to purchase land in the vicinity of Public Square in downtown Cleveland as early as 1909 to provide a terminus for their rapid transit line. Their Rapids could travel at speeds of up to 50 miles per hour (80 km/h), but the line could not be moved further west than 34th Street.
- Main article: Van Sweringen railroad holdings
In order to meet the Vans' guidelines that the Rapid would not travel in street traffic, the brothers bought a 51% interest in the 523 mile (842 km) New York, Chicago and St. Louis Railroad (Nickel Plate) in 1915 from the New York Central Railroad. The route gave the Vans an unobstructed path to downtown Cleveland. From this acquisition, the Vans formed the Nickel Plate Securities Corporation, from which they would use investor money to buy a controlling interest in other major United States rail companies. At their zenith in 1928, the Vans controlled 30,000 miles (50,000 km) of rail worth $3 billion, nearly all of it purchased through credit from lenders. Lines under their control included the Erie Railroad, Pere Marquette Railway, Hocking Valley Railway and Chesapeake and Ohio Railway. They managed to control this huge (for the time) system by a maze of holding companies (including the Alleghany Corporation) and interlocking directorships.
To solve the problem of the passenger station, the Vans purchased more rights of way that gave them access to area below the southwest corner of Cleveland's Public Square. Again, the Vans planned another city within a city to solve their rail dilemma; the result was the Union Terminal Complex, a mixed use high rise offices, shopping and hotel above ground, and train depot, rapid station below grade. The centerpiece of this massive complex was named Terminal Tower, which was the second tallest skyscraper in the United States at the time of its completion.
[edit] The Terminal Tower
The Van Sweringens realized that, if their plans for a Public Square station were to succeed, they would have to include all the electric railways -- streetcars, rapid transit and interurban lines -- as well as local freight and warehousing facilities. Following the suggestion of an official of the Baltimore & Ohio Railroad they added plans to include steam railways.
On 1 March 1917 the engineers of the Erie Railroad, the Nickel Plate, and the Cleveland Terminal Company reported a new freight and passenger terminal located on Public Square in downtown Cleveland would be economical. The plan provided twelve stub end tracks for the steam passenger trains, with loops for local and interurban cars above. The space above the tracks was to be developed for stores and office buildings.
In 1918, A.H. Smith, the regional Director of the Eastern Division of the United States Railroad Administration, asked whether the proposed facility could be sufficiently enlarged to include the railroads using the lakefront station. Thus it was Smith who initiated the idea for a "Union Station" on Public Square. In 1919, the Pennsylvania Railroad withdrew from the project.
In 1923 the Van Sweringens announced their plans to build The Terminal Tower (a tall building to increase office space) over the Union Station to compare to the Woolworth Building in New York City. It was necessary to design the buildings to avoid vibrations from the trains below. Construction began in 1926 as 16 caissons each went down 200-250 feet (60 to 75 m) to support the weight of the building. Construction was completed in 1930.
In 1973, Amtrak chose to move out of the station, instead serving a small station along the lake route, ending intercity service to the station, though Cleveland Rapid Transit continued its local services. In 1975, the Rapid and other municipal rail and bus routes were combined under the auspices of the Greater Cleveland Regional Transit Authority. The station area was converted into a shopping mall known as Tower City Center, which opened in 1988.
[edit] Terminal Tower facts
- Construction began in 1926.
- Dedicated in 1930.
- 52 floors, 708 feet (216 m) tall, (second tallest building in the world when completed in 1930).
- Tallest building outside of New York City until 1967.
- There is a 63 foot (19 m) flagpole at the top, taking it to 771 feet (235 m).
- Function of the Terminal Tower is office space, hotel, retail space, and Union Station.
- More than 1,000 buildings were taken down to build the Tower Complex.
- Several streets were eliminated and others were built during the development of the complex.
- 2.5 million cubic yards (1,900,000 m³) of material was removed from the tower site, making it the second largest excavation project in the world at that time.
[edit] Brothers to the end
The fortunes of the Vans rose in the 1920s. By 1929, their holdings were valued at $3 billion, mostly as a result of the high valuation of stocks on the New York Stock Exchange. Their house of cards tumbled when the Great Depression began, causing the Van Sweringen companies to falter in the 1930s. While Shaker Heights rose to join the ranks of Beverly Hills and Wellesley, Massachusetts, the rail empire suffered financial difficulties. Loans were foreclosed upon and assets were sold to meet interest payments for their debts.
Mantis' health began to decline in 1934 and he died on December 12, 1934. Orris was quoted as saying "I don’t know what to do, or how to do it, or where to go from here." O.P. Van Sweringen died on board a train near Hoboken of coronary thrombosis on November 22, 1936. At the time of his death, O.P. Van Sweringen was worth less than $3,000.
The brothers are buried together in Cleveland's Lakeview Cemetery under a tombstone that reads: "Brothers".
[edit] External links
[edit] Sources
- Invisible Giants: The Empires of Cleveland’s Van Sweringen Brothers. Herbert H. Harwood Jr. Indiana University Press, 2003. ISBN 0-253-34163-9