U.S. Highway 121 is a proposed highway designated as the Coalfields Expressway, a four lane highway stretching from Beckley, West Virginia to Pound, Virginia, approximately 62 miles in length. It is designed to connect Interstate 77/Interstate 64 in West Virginia near Beckley to State Route 83 in Buchanan County, Virginia at Slate.
Contents |
[edit] History
The Coalfields Expressway will depart from an expanded Interstate 64/Interstate 77 interchange and travel southwest through depressed areas of West Virginia to State Route 83 in Buchanan County, Virginia at Slate. The roadways US 121 will replace are deficent in the fact that the existing roadways have limited passing opportunities, steep grades, and low design speeds. The expressway will generally follow West Virginia Route 16 through Raleigh and Wyoming Counties, West Virginia Route 83 in McDowell County, and State Route 83 in Buchanan County, Virginia to Slate.
[edit] West Virginia
Construction started in 1999 with a three-level diamond interchange near Welch in western West Virginia. This will facilate traffic going between the King Coal Highway/Interstate 73/Interstate 74 and the Coalfields Expressway (US 121). Grading work was completed in 2003; the three-level diamond should be completed in 2007.
Further eastward, work is continuing on a segment of the Expressway in the vicinity of Sophia and Crab Orchard near Beckley totalling 3.5 miles. Grading and preliminary paving operations have been completed, as well as the gradings and bridge construction for a diamond interchange for West Virginia Route 54 and a bridge over West Virginia Route 16. In November of 2004, a contract was awarded for paving operations at a cost of $11.5 million from Surveyor Creek Road to the West Virginia Route 16 interchange. With this segment of the Expressway completed, a new tie-in will be complete from Surveyor Creek Road to five-lane West Virginia Route 16, as well as an interchange with West Virginia Route 54.
Two contracts totaling $22.2 million are currently under construction. One projects involves grading and drainage operations on 2.57 miles of US 121 from Big Ridge to Surveyor Creek Road that involves nearly five million cubic yards of excavation.
[edit] Interstate 66 connection to Kentucky?
Interstate 66 is a proposed cross-state highway from the far reaches of western Kentucky to Pike County. Construction of the highway could begin as early as 2007, with the limited-access highway in Pike county traversing from U.S. Highway 23 south of Pikeville and proceed northeast and north of Fishtrap Lake to Kimper. It would continue to McVeigh along Kentucky Route 199, and cross the Tug Fork River south of Matewan, West Virginia and connect with the King Coal Highway (US 52) in Mingo County, West Virginia.
The proposed Interstate 66 would then run south US 119 (Corridor G) but north of US 121 (Coalfields Expressway) that would include a new four-lane highway and a two-lane tunnel. All three roadways, Interstate 66, US 121 (Coalfields Expressway), and US 119 (Corridor G) are all independent of each other.
As of 2004, the proposal for Interstate 66 in West Virginia is effictively dead. If any Interstate 66 routing is made in West Virginia, it would most likely follow an upgraded Coalfields Expressway to Beckley.
[edit] References
- Interstate 66. Kentucky Transportation Cabinet. 20 June 2003 [1].
- Coalfields Expressway Web Site. Coalfields Expressway Authority. 20 June 2003 [2].
- Lokay, Roger W. E-mail to the author.