Tunnel hole-through
From Wikipedia, the free encyclopedia
Tunnel hole-through is the time during the construction of a tunnel built from both ends, where the accurarcy of the survey work becomes evident. Many tunnels report breakthroughs with an accuracy of only a few inches, indeed it is hard to think of one much worse than this.