Spean Bridge railway station
From Wikipedia, the free encyclopedia
Spean Bridge | |
Drochaid an Aonachain | |
---|---|
Location | |
Place | Spean Bridge |
Local authority | Highland |
Operations | |
Station code | SBR |
Managed by | First ScotRail |
Platforms in use | 2 |
Annual entry/exit 02/03 | 5,050 * |
Annual entry/exit 04/05 | 5,911 ** |
History | |
7 August 1894 | Opened |
22 July 1903 | Services to Fort Augustus commenced |
1 December 1933 | Line to Fort Augustus closed |
National Rail - UK railway stations | |
* based on sales of tickets in 2002/03 financial year which end or originate at Spean Bridge. Disclaimer (PDF) | |
** based on sales of tickets in 2004/05 financial year which end or originate at Spean Bridge. Disclaimer (PDF) |
Spean Bridge railway station is a railway station serving the village of Spean Bridge in the Highland region of Scotland. This station is on the West Highland Line.
[edit] History
The station was laid out with two platforms, one on either side of a crossing loop. There are sidings on the north side of the station.
On 18 January 1987, the crossing loop was altered to right-hand running. The original Down platform has thus become the Up platform, and vice versa. The change was made in order to simplify shunting at this station, by removing the need to hand-pump the train-operated loop points to access the sidings.
[edit] Signalling
From the time of its opening in 1894, the West Highland Railway was worked throughout by the electric token system.
Alterations in connection with the construction of the line to Fort Augustus saw the original Spean Bridge signal box replaced by two new boxes in 1901. Spean Bridge Junction box was subsidiary to Spean Bridge Station box. The Junction box closed on 20 September 1921.
The most recent signal box at Spean Bridge, which opened on 28 August 1949, was located on the Up platform (which is now the Down platform). It contained 30 levers.
Spean Bridge lost all its semaphore signals on 2 March 1986, in preparation for Radio Electronic Token Block (RETB) signalling. The RETB system was commissioned between Upper Tyndrum and Fort William Junction on 29 May 1988. This resulted in the closure of Spean Bridge signal box and others on that part of the line. The RETB is controlled from a Signalling Centre at Banavie railway station.
The Train Protection & Warning System was installed in 2003.
[edit] External links
- Train times and station information for Spean Bridge railway station from National Rail
- Map and aerial photo of Spean Bridge railway station from Multimap.com
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Roy Bridge | First ScotRail West Highland Line |
Fort William | ||
Tulloch or Roy Bridge (on request) |
First ScotRail Highland Caledonian Sleeper |
Fort William | ||
Historical Railways | ||||
Roy Bridge Line and Station open |
West Highland Railway | Fort William Line and Station open |
||
Terminus | Invergarry and Fort Augustus Railway | Gairlochy Line and Station closed |