Skybus Metro

From Wikipedia, the free encyclopedia

Skybus Metro in operation
Enlarge
Skybus Metro in operation

Skybus Metro is a rapid transit system of the Konkan Railway in India.

The system is under construction and consists of an elevated track with the cars suspended below the track, like the Schwebebahn Wuppertal or H-Bahn systems in Germany. Construction of an initial 1.6 kilometre (1 mile) long test segment of track began in November 2003 in Madagaon, Goa.[1][2]

Systems using this technology have been proposed for the country's more densely populated cities like New Delhi and Mumbai, but no system has yet opened for revenue service. Installation of future systems, particularly in New Delhi, has run into pressure from some politicians as an unproven technology.[2]

[edit] References

  1. ^ Parthasarathy, Anand (2003-11-12). Work begins on trial track of SkyBus Metro. The Hindu. Retrieved on 2006-06-07.
  2. ^ a b Pandey, Vineeta (2005-03-15). Skybus project: Fantasy or reality?. The Times of India. Retrieved on 2006-06-07.

[edit] External links


  1. REDIRECT Template:Named Passenger trains of India

[edit] Udyan Express

6529Dn/6530 up Udyan Express was introduced in 1980 and itis the premier train and actually the first broadguage train connecting Mumbai with Bangalore city. It plies via Guntakal and takes roughly 24 hours to cover the distance of 1218 Km.s . It reaches Bangalore in the morning unlike the other two trains Dadar( Mumbai) Bangalore Chalukya Express( via Miraj - 6 days a week) and Lokmanya Tilak terminus ( Mumbai ) Coimbtore ( via Guntkal, Bangalore ) express which reach Bangalore around 22-00 P.M. Right Since inception Udyan is an elite train and patronized by educated elite crowd. the train is very punctual and clean but bit slow.The train is also patronized very heavily by Mumbai-Pune commutersand in the Dn. Direction S6 coach is reserved for mumbai -Pune commuters.

Few years ago only for one day railways ran Superfast train to Bangalore starting from Dadar at 11-20 a.m to reach Bangalore at 8-50. a.m on the next day. The train does not have a pantry car. Recently it's speed is reduced by 50 minutes as it now halts at Gooty at 2-00a.m to disturb the sleep of passengers ( earlier it used to ply via Bypass) and this is exactly opposite to the current policy of railways to introduce bypass. If around 28 Km.s of track between Guntakal and Anantpur is converted to broadguage the distance will be reduced by 20 Km.s Moreover if the train takes the other route rather than plying via SaiPrashanti nilayam between Anantpur and dharmavaram the distance can be further reduced.

Perhaps the most severe criticism is faced by Udyan express through Media (The Dailies Navbharat times, Maharashtra times a couple years ago ) for the anti environmental practices employed by railways on this train. The train plies on diesel traction on the Electrified Mumbai-Pune track ( Electrified since 1935) and wastes fuel as well as spoils the scenic area of khandala ghat section. We give the schedule in below. CST stands for mumbai Chatrapati Terminus Dn direction 6529 DN:- CST 8-05 Dadar8-20 Kalyan 9-05 lonavala 10-25 Pune 11-40 Solapur 15-55 Bangalore city 8-50(II day) Up Direction 6530 UP:- Bangalore: 20-00 Solapur 11-10 Pune 15-40 Kalyan18-40 Kalyan 19-30 Dadar19-30 CST 19-55. The train alos halts at Bangalore cantoment and Bangalore East. Besides the train halts at many stations between Wadi Junction and bangalore city surprisingly more than the halts of Parbhani-Bangalore express. Anil.pedgaonkar 14:01, 13 December 2006 (UTC)Anil Pedgaonkar