Shearon Harris nuclear power plant

From Wikipedia, the free encyclopedia

NRC Region Two
(South)
Alabama
 Bellefonte (unfinished)
 Browns Ferry
 Farley
Florida
 Crystal River 3
 St. Lucie
 Turkey Point
Georgia
 Hatch
 Vogtle
North Carolina
 Brunswick
 McGuire
 Shearon Harris
South Carolina
 Catawba
 Oconee
 H.B. Robinson
 Summer
Tennessee
 Sequoyah
 Watts Bar
Virginia
 North Anna
 Surry

The Shearon Harris nuclear power plant is a single Westinghouse designed pressurized-water nuclear reactor operated by Progress Energy. Located in New Hill, North Carolina, in the United States, about 20 miles (30 km) southwest of Raleigh, it generates 900 MWe, has a 523 foot (160 m) natural drafttt cooling tower, and uses Harris Lake for cooling. The reactor achieved criticality in January 1987 and began providing power commercially in May of that year.

The Shearon Harris site, originally designed for four reactors, has been selected by Progress Energy as the site of a proposed additional reactor .

[edit] External links

In other languages