Image:Peri herzogbergtunnel at.jpg

From Wikipedia, the free encyclopedia

Wikimedia Commons logo This is a file from the Wikimedia Commons. The description on its description page there is shown below.
Description

[en]Tunnel Formwork, Herzogbergtunnel, A2 Motorway Austria - The supporting structure consisted of the PERI HD 200 heavy duty shoring system in a portal-shape design that allowed a continuous flow of site traffic at all times. [de]Tunnelschalung Herzogbergtunnel, Graz, Österreich - Das Traggerüst bestand aus dem PERI HD 200 Schwerlastsystem und wurde portalartig ausgebildet. So war der ungestörte Baustellenverkehr längs der Trasse zu jeder Zeit möglich.

Source

PERI GmbH

Date

2003

Author

PERI GmbH

Permission

PERI GmbH

[edit] Licensing

Creative Commons License
Creative Commons Attribution iconCreative Commons Share Alike icon
This file is licensed under the Creative Commons Attribution ShareAlike 2.5 License

The following pages on the English Wikipedia link to this file (pages on other projects are not listed):

Metadata

This file contains additional information, probably added from the digital camera or scanner used to create or digitize it. If the file has been modified from its original state, some details may not fully reflect the modified image.