Northern Alberta Railways

From Wikipedia, the free encyclopedia

Northern Alberta Railways
logo
Reporting marks NAR
Locale Alberta, British Columbia
Dates of operation 19291981
Track gauge ft 8½ in (1435 mm) (standard gauge)
Headquarters Edmonton, Alberta

The Northern Alberta Railways (AAR reporting mark: NAR) was a Canadian railway which served northern Alberta and northeastern British Columbia. Jointly owned by both Canadian National Railway and Canadian Pacific Railway, NAR existed as a separate company from 1929 until 1981.

Contents

[edit] Predecessor railways

Railway construction in northern Alberta during the early 20th century was dominated by the Grand Trunk Pacific Railway and the Canadian Northern Railway, both of which were building westward from Edmonton, AB to the Yellowhead Pass of the Rocky Mountains.

Following the Dominion Land Survey grants to settlers, the Peace River region of northwestern Alberta was one of the few places left on the prairies with available agricultural land, however there was no railway connection.

Several lines were chartered to serve both the Peace River and Waterways regions of the province, beginning with the Athabaska Railway in 1907. It was to build northeast from Edmonton to Dunvegan, AB, then to Fort George, BC.

[edit] ED&BC

The company was rechartered in 1911 under the ownership of J.D. McArthur as the Edmonton, Dunvegan and British Columbia Railway (ED&BC). Construction of the ED&BC started in 1912 heading toward Westlock, AB, reaching High Prairie in 1914, and Spirit River in 1915. Deciding not to proceed to Dunvegan, a branch was built south from Rycroft, AB to Grande Prairie, AB in 1916 (400 miles northwest from Edmonton).

In 1924 the line was extended to Wembley, AB and it reached Hythe, AB in 1928. In 1930 the line was extended westward across the provincial boundary to its western terminus at Dawson Creek, BC.

[edit] A&GW

In 1909 a charter was granted to the Alberta and Great Waterways Railway (A&GW) to build from Edmonton to Waterways, AB on the Athabasca River. Construction faltered and the line was rechartered in 1913 under the ownership of J.D. McArthur. Construction of the AG&W began in 1914 from Carbondale, AB and reached Lac La Biche, AB in 1916. It reached Draper, AB in 1922 and its terminus at Waterways, AB in 1925.

[edit] CCR

In 1913 a charter was granted to the Central Canada Railway (CCR) under the ownership of J.D. McArthur to build from Winagami Junction, AB on the ED&BC to Peace River Crossing, AB in order to access barge traffic on the Peace River. Construction of the CCR began in 1914 and was completed in 1916.

The CCR was subsequently extended to Berwyn, AB in 1921, then to Whitelaw, AB in 1924, Fairview, AB in 1928 and Hines Creek, AB in 1930.

[edit] PVR

In 1926, the provincial government passed a statute authorizing the government to construct the Pembina Valley Railway from Busby, AB, where it connected to the ED&BC line, to Barrhead, AB.

[edit] Provincial ownership

In 1920, the lines owned by J.D. McArthur entered financial difficulties following the First World War. Coinciding with the problems faced by the McArthur lines (ED&BC, A&GW, and CCR), both the Grand Trunk Pacific Railway (GTPR) and Canadian Northern Railway (CNoR) had fallen victim to similar circumstances brought about by the financial strain of the conflict and falling traffic levels. The Dominion government had nationalized the GTPR and CNoR, along with other previously federally owned lines into the Canadian National Railways.

Following the federal example, and in an attempt to preserve rail service to northern and northwestern Alberta, the provincial government leased the ED&BC and CCR in 1920 for five years. In 1921 the government entered into a five year agreement with the Canadian Pacific Railway (CPR) to operate the ED&BC and CCR. That same year, the provincial government purchased the A&GW outright and chose to operate it separately.

CPR immediately raised freight rates on the ED&BC and CCR lines, charging "mountain prices", claiming that the cost of operating on grades into the Peace and Smoky River valleys of the northwestern prairie was as much as it cost to operate in the Rocky Mountains. Consequently Peace River farmers paid the highest freight charges on the Canadian prairies to reach the lakehead at Port Arthur and Fort William.

The provincial government purchased the ED&BC and CCR from McArthur in 1925, following the expiration of the five year lease. Dissatisfied with the CPR's operation of the ED&BC and CCR, the provincial government allowed the operating contract for the these railways to expire in 1926, with operations subsequently taken over by the new provincial Department of Railways and Telecommunications which was also tasked to operate the AG&W and the newly-built PVR.

In 1928, the provincial government began to solicit proposals from both the CPR and the Canadian National Railways (CNR) for purchasing the provincial railways. In 1924, CNR president Sir Henry Thornton visited the ED&BC line and in 1928, CPR president Edward Beattie did the same.

[edit] Northern Alberta Railways

In 1928 the provincial government grouped the ED&BC, CCR, AG&W, and PVR under the collective name Northern Alberta Railways (NAR), which received a federal charter on March 1929. The NAR was subsequently sold to both the CNR and CPR in equal portions with both companies agreeing to maintain the NAR as a joint subsidiary. At that time, the NAR was the third-largest railway in Canada. In 1937 the NAR began to show a profit for the first time.

In summer 1942, following the entry of the United States into the Second World War, the Alaska Highway civil defence project resulted in tremendous growth for the NAR, as the system was the only railway to service Alaska Highway mile 0 at Dawson Creek.

NAR also saw increased traffic from defence spending in both the Peace River and Fort McMurray regions as Royal Canadian Air Force training bases for the British Commonwealth Air Training Plan were established.

In 1958 the Pacific Great Eastern Railway (PGE), owned by the province of British Columbia, built east to Dawson Creek, BC and then north to Fort St. John, BC. Traffic from Dawson Creek which used to run on NAR now mostly ran on PGE.

NAR completely dieselized its locomotive fleet by October 1960, these where GP 9. 201 - 208 (208 was hit in 1972 and renumbered 211), ???? 301 - 304, and SD 38-2 401 - 404.

Beginning in the 1960s, Alberta's nascent oil and gas industry began to have an impact on the NAR as traffic began to increase on both the Dawson Creek and Fort McMurray branches. In 1964, the federal government built the Great Slave Railway north from the NAR at Grimshaw, AB to Hay River, NWT to carry passengers and cargo which could then be transferred to barges and continue down the Mackenzie River.

In 1966, the passenger train to Waterways was replaced by Budd Rail Diesel Cars, but the experiment was unsuccessful, and it was replaced in 1967 by a mixed train. On June 1, 1974, the passenger train to Dawson Creek was discontinued.

During the 1970s, significant investments also began in the Fort McMurray region as the Athabasca Oil Sands deposits began to be exploited.

[edit] Canadian National Railway

In 1981, CN (name/acronym change after 1960) bought out CPR's share in the NAR system and incorporated these lines into the CN network, allowing CN to operate unhindered north from Edmonton to Hay River, NWT and west to Dawson Creek, BC. NAR disappeared as a corporate entity with the departure of CPR from the joint ownership. NAR shops and Dunvegan Yards in Edmonton were demolished and the new Dunvegan Woods housing development was built on the site.

In 1996, CN identified parts of its former NAR trackage for divestiture, either through sale or abandonment. Several lines were subsequently sold to shortline operators.

  • Swan Landing, AB (near Jasper) to Grand Prairie, AB (the former Alberta Resources Railway) and west to Hythe, AB (west of Grand Prairie on the NAR) is now operated by Alberta Railnet (ARN), which is owned by North American Railnet. CN has maintained ownership of the portion between Hythe, AB and Dawson Creek, BC where it connects to former BC Rail trackage. The trackage between Hythe and Dawson Creek fell into disuse in 1998, but CN agreed to re-open it as a condition of purchasing BC Rail.
  • Edmonton, AB to Boyle, AB (east of Fort McMurray) was purchased in 1997 by the Lakeland and Waterways Railway (LWR), a subsidiary of Canadian shortline holding company RailLink. RailLink was subsequently purchased by RailAmerica.
  • Boyle, AB to Fort McMurray, AB is now operated by Athabascan Northern Railway and is owned by shortline operator Cando Contracting.
  • CN maintains ownership of former NAR trackage between Edmonton, AB and Smith, AB.
  • North and west of Smith, AB, the former NAR to Peace River, AB and Grimshaw, AB, as well as all of the ex-Great Slave Railway north from Grimshaw, AB to Hay River, NWT, was purchased in 1998 by the Mackenzie Northern Railway (MKNR), a subsidiary of Canadian shortline holding company RailLink. RailLink was subsequently purchased by RailAmerica.
  • On January 19, 2006, CN announced the purchase from RailAmerica Inc. of the Mackenzie Northern Railway, the Lakeland & Waterways Railway, and the Central Western Railway (jointly known as RLGN/CWRL).

[edit] References

  • Schneider, Ena (1989). Ribbons of Steel:The Story of the Northern Alberta Railways. Detselig Enterprises Limited, Calgary, Alberta. ISBN 0-920490-97-2.


Current (operating) regional railways of Canada
AMT, CRC, GOT, HBRY, MMA, ONT, QNSL, TRT, BCVX WPY

Former or fallen flag regional railways of Canada
AC, BCOL, NAR


Current (operating) short line railways of Canada
ARND, CBNS, ENR, ETR, GEXR, GRS, GWR, NBEC, NBSR, OBRY, PCHR, QC, SLQ, STER, SRY, TRRY, WABL, WHRC

Former or fallen flag short line railways of Canada
MKNR, SAR, THB