Newport City footbridge
From Wikipedia, the free encyclopedia
Official name | Newport City footbridge |
---|---|
Carries | cyclists and pedestrians |
Crosses | River Usk |
Locale | Newport |
Maintained by | Newport City Council |
Design | Cable-stayed bridge |
Width | Deck 16 feet (5 metres) Max. 49 feet (15 metres) |
Clearance below | 13½ feet (4.1 metres) at high tide |
Opening date | 12 September 2006 |
The Newport City footbridge is a pedestrian/cycle bridge over the River Usk in the city of Newport.
The bridge links the east bank of the river in the vicinity of Colne Street in Maindee to a new public space called Usk Place/University Plaza on the west bank. It is the first major public project in Newport Unlimited's plans to regenerate the city.
Contents |
[edit] Overview
The bridge features two A-Frame masts, which support the bridge from the west bank. The masts are positioned on a shared foundation and anchored at ground level by two 4¾ inch (120mm) diameter cables that are connected the tips of the masts. The forward mast is 262 feet long (80 metres) and the back mast is 226 feet long (69 metres). Because of the angle at which the masts are positioned, the bridge stands at 229ft (70m) above ground. The deck is 16 ft wide (5 metres) and 13½ft (4.1 metres) above water at high tide. The bridge has a clear span of 476 ft (145m).
[edit] Design concept
The dramatic crane structures were designed as a deliberate and symbolic link to the site’s earlier use as trading wharves – but with a modern twist. The deliberate location of the main structures on the west bank means that the vast majority of the construction work was kept away from the houses on the east bank, while avoiding impact on the local river ecology.
[edit] The foundations
The bridge foundations are supported by 30, 35½ inch (900mm) diameter CFA (continuous flight auger) piles varying in length. The bridge structure is suspended on five ground anchors which are drilled 98ft (30m) into the ground.
Approximately 20,000 cubic ft (600 cubic m) of concrete were used in the bridge foundations.
[edit] The masts
The masts are made from sheet steel which was rolled into 'cans'. These were then welded together to produce the tubes for the masts.
The front mast is 2.5m (8.2ft) in diameter and was delivered to site in nine sections. It weighs approximately 275 tons.
The back mast is 1.75m (5.7ft) diameter and was delivered to site in seven sections. It weighs approximately 177 tons.
[edit] The deck
The bridge deck is made up of five sections.
The deck units were installed in sequence and then welded together. Details of the deck units are shown below:
- Deck one and five
- 79ft (24m) long
- 16ft (5m) wide
- weight 19t
- Deck two and four
- 85ft (26m) long
- 31.2ft (9.5m) wide (at the outriggers)
- weight 25t
- Deck three
- 118ft (36m) long
- 49ft (15m) wide (at the outriggers)
- weight 55t
[edit] The cables
A ½mile (800m) of cable is used to support the bridge, varying in diameter from 2in (50mm) to 4¾in (120mm).
[edit] Erection
The main masts for the bridge were erected in the week commencing May 1, 2006 using the largest crane in the UK. [1] It was officially opened on 12 September 2006 (also the centenary of Newport Transporter Bridge) and is the ninth crossing of the Usk in the city.
[edit] Facts
- Maximum mast height: 229ft (70m).
- Mast weight: 836 tons.
- The ballustrades are formed from nearly two miles (three kilometres) of stainless steel wire.
- The bridge deck is fitted with 178 lights.
- The mast bases, back anchor and masts are illuminated by 36 floodlights and uplighters.
[edit] External links
- Time-lapse construction photography
- Client: Newport Unlimited
- Contractors: Alfred McAlpine
- Architect: Grimshaw
- Structural Engineer: Atkins
- Steel Fabricators: Rowecord