Moskovsko-Petrogradskaya Line
From Wikipedia, the free encyclopedia
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
edit |
The Moskovsko-Petrogradskaya Line (Russian: Московско-Петроградская), is the second oldest line of the Saint Petersburg Metro, opened in 1961. It featured the first cross-platform transfer in the USSR. It was also the first metro line in Saint Petersburg to feature a unique platform type that soon became dubbed as "Horizontal Lift". The line cuts Saint Petersburg on a north-south axis and is generally coloured blue on Metro maps.
Contents |
[edit] Timeline
Segment | Date opened | Length |
---|---|---|
Tekhnologichesky Institut-Park Pobedy | April 29, 1961 | 6.5 km |
Tekhnologichesky Institut-Petrogradskaya | July 1, 1963 | 5.9 km |
Park Pobedy-Moskovskaya | December 25, 1969 | 1.8 km |
Moskovskaya-Kupchino | December 25, 1972 | 4.4 km |
Petrogradskaya-Udelnaya | November 6, 1982 | 7.2 km |
Udelnaya-Prospekt Prosveshcheniya | August 19, 1988 | 3.7 km |
Total: | 17 Stations | 29.5 km |
[edit] Name changes
Station | Previous name(s) | Years |
---|---|---|
Sennaya Ploshchad | Ploshchad Mira | 1963–1991 |
[edit] Transfers
# | Transfer to | At |
---|---|---|
1 | Kirovsko-Vyborgskaya Line | Tekhnologichesky Institut |
3 | Nevsko-Vasileostrovskaya Line | Nevskiy Prospekt |
4 | Pravoberezhnaya Line | Sennaya Ploshchad |
The Tekhnologichesky Institut transfer is a cross-platform one. Future transfer to the Kupchinsko-Primorskaya Line will be done via Sennaya Ploshchad.
[edit] Rolling stock
The line is served by the Moskovskoe (№ 3) depot, and has 56 six-carriage trains assigned to it. Most of these are of type 81-714/717, but some are the .5 standard.
[edit] Recent developments and future plans
A one-station north extension of the line to Parnasskaya is planned to be completed in 2006. The ultimate execution of those plans is complicated by the leakage problems with the tunnes that lead it.