Jubilee River

From Wikipedia, the free encyclopedia

The Jubilee River at Slough Weir
Enlarge
The Jubilee River at Slough Weir

The Jubilee River is a hydraulic channel in southern England. It is 11.6 kilometres in length, and was constructed in the late 1990s and early 2000s to take overflow from the River Thames and so alleviate flooding to areas in and around the towns of Maidenhead, Windsor, and Eton in the counties of Berkshire and Buckinghamshire. It achieves this by allowing excess water to be taken via the east bank of the Thames upstream of Maidenhead and returned via the north-east bank downstream of Eton.

Despite being man-made, the Jubilee River looks and acts like a natural river. Its banks offer many varieties of wildlife specially-constructed habitats, intended to act as replacements for those habitats lost from the banks of the Thames during urban expansion in the nineteenth and twentieth centuries.

Dorney Bridge
Enlarge
Dorney Bridge

At the time of its formation the channel represented the largest man-made river project ever undertaken in Britain, and the second largest in Europe. In addition to creation of the channel itself and its various flow control mechanisms, the scheme involved the construction of many bridges for road, rail and foot traffic; one of which, Dorney Bridge, included providing the means of taking the river through a nineteenth-century Brunel railway embankment while it continued to carry main line trains to and from London and Bristol. This delicate work to infrastructure considerably more than a century old was made possible by a process known as jacked box tunnelling, in which a pre-formed concrete culvert 165 ft long, 75 ft wide and 31 ft high was moved through the pre-frozen embankment behind boring machines, to become Britain's largest example of this type of tunnel.

A further requirement was to take the river through another Victorian structure, Black Potts Viaduct, which forms part of the railway line built to take Queen Victoria's royal train almost up to the gates of Windsor Castle. This work called for substantial protective structures to be put in place in order to preserve the structural integrity of the viaduct.

The new river constitutes a highly complex civil engineering accomplishment which embraced many technical, ecological and social issues; including extensive compulsory purchases, community involvement and a public enquiry. Conception to fruition took roughly twenty years.

Black Potts Viaduct
Enlarge
Black Potts Viaduct

The choice of a name for the river was put to the local population in the form of a poll. The result was a strong preference for 'Jubilee', as it was being completed in Queen Elizabeth's golden jubilee year of 2002 and as her majesty's preferred home is at Windsor Castle, in one of the three towns being protected by the scheme.

[edit] External links

[edit] See also

In other languages