The HVDC Leyte - Luzon is a high voltage direct current transmission link in the Philippines between geothermal power plants on the island of Leyte and the southern part of island of Luzon. The HVDC Leyte – Luzon went in service on 10 August 1998.
The HVDC Leyte - Luzon begins at Ormoc converter station (Leyte Province) and ends at Naga converter station (Province of Camarines Sur). It consists three sections:
- Leyte-Samar overhead line
- submarine cables across San Bernardino Strait between Cabacungan (Allen, Samar) and Sta Magdalena (Sorsogon Province, Luzon)
- overhead line at Luzon
The length of submarine cable is 21 km and the total length of overhead lines is 430 km. The HVDC Leyte - Luzon can transfer an output of 440 MW. And it's implemented as monopolar line for a voltage of 350 kV.
Aim of the HVDC link is to feed the AC grid in the Manila region. Beside of overall connection of grids, the HVDC Leyte – Luzon stabilize the AC network. The interconnector is manufactured by the ABB Group in cooperation with Marubeni Coproration and it's operated by state owned National Transmission Corporation.