First ScotRail

From Wikipedia, the free encyclopedia

Image:ScotRaillogo.jpg
Franchise(s): ScotRail
17. October 2004 – 2011
Main area(s): Scotland
Other area(s): London, Watford, Crewe, Preston, Carlisle and Newcastle
Fleet size: 309
Stations: 336
Parent company: First Group
Web site: www.firstscotrail.com

First ScotRail is the brand under which First Group PLC runs its railway franchise to operate all domestic passenger services within Scotland, as well as the cross-border Caledonian Sleeper service to London, England. First Group has its headquarters in Aberdeen, Scotland.

On 17 October 2004 the franchise was transferred to First Group from National Express resulting in the rebranding from ScotRail to First ScotRail. This was the first time the franchise has been renegotiated since the privatisation of British Rail. Franchises are now controlled by the Scottish Executive but on this occasion was dealt with by the SRA as their agent.

Contents

[edit] Network

The First ScotRail network is a mixture of long-distance, commuter and rural lines, totalling 2,729 km (1,696 miles), handling 66.1 million passenger journeys in 2003-4.

The densest part of the network is the suburban network around Glasgow, consisting of 183 stations — the second largest suburban rail network in the UK after London. Much of it is 25kV AC electrified. Glasgow’s main terminal stations are Central Station and Queen Street Station. Although First ScotRail operate the trains in this area, they do so under the Strathclyde Partnership for Transport (SPT) name.

A Class 170 Turbostar train in First ScotRail livery at Inverness
Enlarge
A Class 170 Turbostar train in First ScotRail livery at Inverness

Edinburgh’s suburban network is less dense than Glasgow’s, but is still relatively extensive. Edinburgh’s main station is Waverley Station.

Express services operate between Edinburgh, Glasgow, Inverness and Aberdeen. The Highland Main Line links Inverness to the south.

Rural lines include the scenic West Highland Line, Kyle Line and Far North Line. These are not generally well used, but are kept open for a variety of reasons, including social necessity, tourism and political considerations.

The company also operates some services that venture south of the border; principally the Caledonian Sleeper services to London Euston, along the West Coast Main Line, and a twice daily cross country service between Newcastle-upon-Tyne and Stranraer via Carlisle and Kilmarnock.

The majority of Scotland’s 340 passenger stations are operated by First ScotRail with Network Rail retaining ownership — the exception being Prestwick International Airport station, which is both owned and operated by the airport. Only three other stations in Scotland are not operated by First ScotRail: Dunbar (GNER), Edinburgh Waverley (Network Rail) and Glasgow Central (Network Rail). Curiously, they operate Lockerbie railway station but none of their services call there.

[edit] Fleet

A Class 156 Sprinter train in the old National Express ScotRail livery at Oban
Enlarge
A Class 156 Sprinter train in the old National Express ScotRail livery at Oban

The present diesel fleet is comprised of a mixture of Class 156 Super Sprinter and Class 158 Express Sprinter units, which were acquired during the British Rail era, and Class 170 Turbostar sets acquired post-privatisation.

The present electric fleet includes Class 314, Class 318, Class 320, Class 322 and Class 334 Juniper units.

The Scotland-Euston overnight services are comprised of ex-InterCity Mark 2 and Mark 3 sleeper coaches, which are hauled by EWS locomotives.

During 2005, the Edinburgh-North Berwick line were operated by EWS-Class 90 electric locomotives with former Virgin Trains Mark 3 coaches. In late 2005, Class 322 units were reintroduced onto the line. A refurbishment program is taking place for these units. It is considered bad use of resources to use diesel trains on an entirely-electric line, thus precluding the use of shorter Turbostar units.

ScotRail has previously operated Class 101 and Class 117 diesel units, and Class 303 and Class 305 electric units, but these have now all been withdrawn. ScotRail has also operated Class 150 diesel but these have transferred to other operators following deliveries of new trains.

[edit] Performance in late 2004

The performance figures for National Express’s last quarter as franchise holders, July to September 2004, are:

  • 82.8% of trains arriving within 5 minutes of the scheduled time. Down 4.2% on the same quarter the previous year.
  • 84.2% of trains arriving within 5 minutes of the scheduled time. Down 1.0% on the previous year as a whole.

The performance figures for First Group’s first quarter as franchise holders, October to December 2004, are:

  • 79.8% of trains arriving within 5 minutes of the scheduled time. Down 1.9% on the same quarter the previous year
  • 83.7% of trains arriving within 5 minutes of the schedules time. Down 0.5% on the previous year as a whole.

Note: First Group did not start operating the franchise until 17 October 2004.

[edit] See also

[edit] References

[edit] External links

Wikimedia Commons has media related to:
Wikimedia Commons has media related to:
Preceded by
ScotRail
Operator of ScotRail franchise
2004-present
Succeeded by
N/A


Domestic: Arriva Trains Wales - c2c - Central Trains - Chiltern Railways - First Capital Connect
First Great Western - First ScotRail - Grand Central1 - GNER - Heathrow Connect
Hull Trains - Island Line2 - Merseyrail - Midland Mainline - Northern Rail
Northern Ireland Railways3 - 'one' - Silverlink - Southeastern - Southern
South West Trains2 - TransPennine Express - Virgin Trains
International: Enterprise3 - Eurostar
Airport Link: Gatwick Express - Heathrow Express - Stansted Express4
Sleeper: Caledonian Sleeper5 - Night Riviera6
1 Starts 20 May 2007 - 2 To be replaced by the South Western franchise in February 2007
3 Operated on the Irish railway network - 4 Operated by 'one' - 5 Operated by First ScotRail
6 Operated by First Great Western


Future passenger train operators in Great Britain
New Franchises: Cross Country1 - East Midlands1 - London Overground1 - South Western2
West Midlands1
Proposed open-access
operators:
Grand Union3 - Wrexham & Shropshire4
1 Starts November 2007 - 2 Starts February 2007 - 3 Proposed - 4 Awaiting Approval


Defunct train operating companies:
InterCity: Anglia Railways - Great Western Trains
London & South East: Connex South Central - Connex South Eastern - First Great Eastern - First Great Western Link
South Eastern Trains - Thames Trains - Thameslink - wagn
Regional: Arriva Trains Merseyside - Arriva Trains Northern - First North Western - MTL - North Western Trains
Northern Spirit - ScotRail - Valley Lines - Wales and Borders - Wales and West - Wessex Trains