The Dual Contracts of 1913, also known as the Dual Subway System, were contracts for the construction and/or rehabilitation and operation of rapid transit lines in the City of New York. The majority of the lines of the present-day New York Subway were built or reconstructed under these contracts. The contracts were "dual," in that they were signed between the City and two separate private companies.

Contents

[edit] Background

1910 plan for IRT expansion
Enlarge
1910 plan for IRT expansion

Contract 3 was signed between the City and the IRT, operator of the original subway line in New York City. Contract 4 was signed between the City and the Municipal Railway Company, a subsidiary of the BRT (later BMT), formed especially for the purpose of contracting with the City for construction of the lines. Contracts 1 and 2 were the original subway contracts between the City and the IRT for the first subway in New York. These contracts predated the Dual Contracts.

Under the terms of Contracts 3 and 4, the City would build new subway and elevated lines, and rehabilitate and expand certain existing elevated lines, and lease them to the private companies for operation. The cost would be borne more-or-less equally by the City and the companies. The City's contribution was in cash raised by bond offerings, while the companies' contributions were variously by supplying cash, facilities and equipment to run the lines.

The contract negotiatons were long and sometimes acrimonious. For instance, when the IRT was reluctant (if not totally opposed) to the BRT's proposed access to Midtown Manhattan via the Broadway Line, the city and state negotiators immediately offered the BRT all of the lines under proposal, including such obvious IRT links as the upper portion of the Lexington Avenue Line.

The assignment of the proposed lines in Queens proved to be an imposition on both companies. Instead of one company enjoying a monopoly in that borough, both proposed lines — a short line to Astoria, and a longer line reaching initially to Corona, and eventually to Flushing — were assigned to both companies, to be operated in what was called "joint service." The lines would start from a huge station called Queensborough Plaza. The IRT would access the station from both the 1907 Steinway Tunnel and an extension of the Second Avenue Elevated from Manhattan over the Queensborough Bridge. The BRT would feed the Queens lines from a new tunnel from 60th Street in Manhattan.

The BRT had a big disadvantage, as both Queens lines were built to IRT specifications. This meant that IRT passengers would have a one-seat ride to Manhattan destinations, whereas BRT passengers had to make a change at Queensborough Plaza. This came to be important when service was extended for the 1939 World's Fair, as the IRT was able to offer direct express trains from Manhattan, and the BRT was not. This practice lasted well into the municipal ownership of the lines, and was not ended until 1949. Both companies would share in the revenues from this service. Initially, there were separate stopping areas and fare controls for each company at shared stations, but this was operationally unworkable, and eventually a proportional formula was worked out.

Several provisions were imposed on the companies, which eventually led to their downfall and consolidation into City ownership in 1940:

  • The fare was limited to five cents, and this led to financial troubles for the two companies after post-World War I inflation.
  • The City had the right to "recapture" any of the lines it built, and run them as its own.
  • The City was to share in the profits.

[edit] IRT lines

The following lines were built under the Dual Contracts for the IRT:

The following lines were rebuilt with extra tracks:

[edit] BMT lines

1924 map of the BMT Dual Contracts lines
Enlarge
1924 map of the BMT Dual Contracts lines

All Manhattan and Queens BMT lines were built under the Dual Contracts, as were all subway and some elevated lines in Brooklyn.

[edit] Lines and line segments built new

[edit] Grade-separated rights-of-way built to replace surface railroads

1911 plan, giving all the contracts to the BRT
Enlarge
1911 plan, giving all the contracts to the BRT

[edit] Existing rights-of-way rehabilitated and expanded

[edit] External links


view  talk  edit
New York City Subway (official site)
Services
Shuttles (S) 42nd StreetFranklin AvenueRockaway Park
Unused/defunct 8 9 10 11 12 13 H K P T U X YJFK Express
BMT: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Shuttles: 63rd StreetBowling GreenCulverGrand StreetOther
Under construction Second Avenue Subway7 Subway ExtensionFulton Street Transit Center
Divisions IRTBMTIND (Second System)
Lists Inter-division connectionsInter-division transfersLinesServicesStationsTerminalsYards
Miscellaneous AccessibilityChainingHistoryMetroCardNomenclatureRolling stock
Other NYC transit Rail: AirTrain JFKAmtrakLIRRMetro-NorthNJT (rail)PATHStaten Island Railway
Other: NJT (buses)MTA busesNYCT busesRoosevelt Island Tramway