Drayton Park railway station

From Wikipedia, the free encyclopedia

Drayton Park
Drayton Park station (February 2006)
Location
Place Islington
Local authority London Borough of Islington
Operations
Managed by First Capital Connect
Platforms in use 2
Annual entry/exit
0.130 million *
Transport for London
Zone 2
History
1904
1964
1975
1976
Opened (GN&CR)
Became terminus
Closed (Northern Line)
Reopened as through station (British Rail)
Transport for London
List of London stations: Underground | National Rail
* based on sales of tickets in 2004/05 financial year which end or originate at this station. Disclaimer (PDF)
Portal:Drayton Park railway station
BR Portal

Drayton Park railway station is on the Network Rail Northern City Line which carries First Capital Connect services between Moorgate and Welwyn Garden City or Hertford via Finsbury Park. Drayton Park lies between Finsbury Park and Highbury & Islington, and is Travelcard Zone 2

The station is in Islington, just off the Holloway Road near its southern end, close to the Liverpool Road junction. It stands in the shadow of Arsenal football club's new Emirates Stadium

[edit] History

Drayton Park was opened by the Great Northern & City Railway (GN&CR) on 14 February 1904. The GN&CR was constructed to provide a route for Great Northern Railway (GNR) trains between the GNR station at Finsbury Park and the Metropolitan Railway (MR) and City & South London Railway (C&SLR) station at Moorgate in the City of London. With the exception of Drayton Park station and the former depot which are in a deep cutting, the railway was constructed in deep tube tunnel. The tunnels were constructed with a larger diameter than the other deep tube railways being built at that time to accommodate the GNR mainline trains but a dispute between the two companies prevented the GN&CR connecting its tunnels to the GNR platforms at Finsbury Park. The GN&CR tunnels, instead, terminated beneath the mainline station without a connection to the surface. Rolling stock accessed the GN&CR tracks via a link tunnel under Highbury Fields to the North London Railway west of Canonbury.

In 1913 the GN&CR was taken over by the MR. The MR ran the line under its own name until it became part of the London Passenger Transport Board (LPTB) in 1933. In preparation for the LPTB's "Northern Heights" plan the line was transferred to the control of the Morden-Edgware Line (now the Northern Line).

How Drayton Park might have appeared on the London Underground Map today if the Northern City Line had been connected to the LNER Northern Heights branch to Alexandra Palace
Enlarge
How Drayton Park might have appeared on the London Underground Map today if the Northern City Line had been connected to the LNER Northern Heights branch to Alexandra Palace

The Northern Heights plan involved the construction of the GN&CR's unbuilt connection from Drayton Park to the surface platforms at Finsbury Park and the transfer of a London and North Eastern Railway (LNER) branch from there to Edgware, High Barnet and Alexandra Palace. By 1939 much of the work for the connection of the lines had been done including the ramps needed to take the tracks from Drayton Park up to Finsbury Park and the opening of the connection was scheduled for autumn 1940 but the start of World War II put a halt to further construction.

After the war the plan to incorporate the Alexandra Palace branch into the Underground was cancelled and it closed to passengers in the 1950s. No further effort was made to connect the City Line to the main line platforms (controlled after the 1948 nationalisation by British Railways) and Northern Line tube trains continued to run in tunnel to Finsbury Park.

Although the Victoria Line does not visit Drayton Park its construction during the 1960s did have a significant impact on the station. The City Line tunnels north of Drayton Park were closed on 3 October 1964 and were reused by the Victoria Line which was connected to them south of Finsbury Park. Drayton Park became the northern terminus of the City line which later became known as the Northern Line Highbury Branch.

The remnants of the station's stabling yard are visible to the left of the platform, though the area has already been encroached upon by the bridge support for the then unfinished Emirates Stadium. (February 2006)
Enlarge
The remnants of the station's stabling yard are visible to the left of the platform, though the area has already been encroached upon by the bridge support for the then unfinished Emirates Stadium. (February 2006)

On 4 October 1975 the line was closed and ceased to be part of the London Underground. The line was transferred to British Rail (BR) and the unused ramps from the cancelled Northern Heights plan finally received the tracks to connect the line to the surface platforms at Finsbury Park. On 8 August 1976 Drayton Park reopened as part of the BR network with main-line-sized trains running to Old Street. On 8 November 1976, seventy-two years after the GN&CR first opened, the line was opened fully for mainline trains from Moorgate to Finsbury Park and beyond as had been originally intended.

Trains running on the line have dual power pick-up equipment. In the tunnel section of the line train use third rail supplies but above ground they take overhead supplies via pantograph equipment. Trains change between the two methods at Drayton Park and the transistion may be noticeable as sparks or momentary power blackouts.

[edit] External links


Preceding station National Rail Following station
Finsbury Park   First Capital Connect   Highbury & Islington
Railway stations of London
Central area | Greater London
Managed by Network Rail: Cannon StreetCharing CrossEustonFenchurch StreetKing's CrossLiverpool StreetLondon BridgePaddingtonVictoriaWaterloo
Managed by train operator: BlackfriarsMaryleboneMoorgateSt Pancras

 

UK railway stations

  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z