Chicago Tunnel Company

From Wikipedia, the free encyclopedia

Pre-1910 photograph of the Chicago Tunnel Company
Enlarge
Pre-1910 photograph of the Chicago Tunnel Company

The Chicago Tunnel Company built a unique freight tunnel network under the downtown of the city of Chicago. It inspired the construction of the London Post Office Railway.

Contents

[edit] History

map
Enlarge
map

Construction of the subway began in 1899, and the full system with a tunnel under almost every street of downtown Chicago was finished in 1906. Six feet wide by seven and a half high (1.8 by 2.3 metres) tunnels were officially constructed to house only telephone cables, but the Illinois Tunnel Company also secretly installed two foot gauge railroad tracks in them.

[edit] Land reclamation

Excavations from tunnel construction were used to fill in Lake Michigan to create land for:

[edit] Experiment

First test trains were run a few years after the start of construction, which locomotives received power from a third rail cog which was situated in a slot between the two running rails, but later it was decided to change the third rail to overhead lines. Tunnel freight cars were delivered to railroad freight stations, warehouses, office buildings, and store buildings via elevators or direct access.

[edit] Operation

In 1912, the Illinois Tunnel Company, daughter of Illinois Telephone and Telegraph Company was reorganized and renamed the Chicago Tunnel Company, and all of the telephone cables from tunnels were removed. Through the years, the system has expanded to approximately 60 miles (97 km) of track, with 149 four wheeled electric locomotives, and over 3000 freight cars in service.

Trucks stole away significant amounts of business, and by the late 1940s, customers began to switch from coal to natural gas to heat their buildings. The ones that kept burning coal switched to delivery by truck because unloading from the surface was easier, and a complex conveyor system was not required.

Even though coal deliveries were made with trucks, it was still more efficient to remove ashes by tunnel. This basically left the company in the ash removal business for the last ten years of operation.

[edit] Closure

Chicago Tunnel Company was declared bankrupt in 1956, the network was closed and abandoned in the summer of 1959. The scrappers removed almost all of the overhead wire and elevators; locomotives and steel freight cars were removed and scrapped as well.

[edit] Disaster

In 1991 near the Kinzie Street bridge, a new set of pilings were installed to prevent barges from bumping into the bridge. As the pillars were dug into the riverbed, a miscalculation was made and caused severe damage to the tunnel directly below the river.

In 1992, a cable television employee in the tunnel underneath the Chicago River videotaped mud and water oozing in where the bottom of wooden pilings penetrated into the tunnel's roof. Official response was slow; no emergency measures were deemed necessary, and a formal bidding process began for the contract to repair the damage. But in April, a large hole formed in the roof of the tunnel where a new wooden piling had been driven into the riverbed, causing the river to pour into the tunnels. The entire system was quickly flooded in what became known as the Great Chicago Flood, including many basements that were still connected to it, causing severe property damage and disrupting utility service throughout the Loop. The accident shut down the entire downtown area for days, causing considerable economic losses.

At that point, government agencies belatedly responded. The leak was stopped and the tunnels of water were emptied within days (at great cost). The tunnels are still used for power and communication cables.

[edit] See also

[edit] For further reading

  • Moffat, Bruce (1982). Forty Feet Below: The Story of Chicago's Freight Tunnels. Interurban Press. ISBN 0-916374-54-8.

[edit] External links

In other languages