Burlington Northern Railroad

From Wikipedia, the free encyclopedia

Burlington Northern Railroad
logo
System map
The Burlington Northern system (shown in green) at the time of the BNSF merger.
Reporting marks BN, BNFE, BNFT
Locale Alabama, Arkansas, California, Colorado, Florida, Idaho, Illinois, Iowa, Kansas, Kentucky, Minnesota, Mississippi, Missouri, Montana, Nebraska, North Dakota, Oklahoma, Oregon, South Dakota, Tennessee, Texas, Washington, Wisconsin, and Wyoming
Dates of operation 19701995
Successor line BNSF
Track gauge ft 8½ in (1435 mm) (standard gauge)
Headquarters St. Paul, Minnesota

The Burlington Northern Railroad (AAR reporting marks BN) was a United States-based railroad company operating between 1970 and 1995.

Contents

[edit] History

The Burlington Northern was the product of a March 2, 1970 merger comprising the Great Northern Railway, the Northern Pacific Railway, the Chicago, Burlington and Quincy Railroad, and the Spokane, Portland and Seattle Railway. Consent for this merger came only on the fourth attempt dating back to the days of James J. Hill, but for many years they shared a headquarters building in Saint Paul, Minnesota until the merger was finally approved. On November 21, 1980, the former St. Louis - San Francisco Railway was acquired. In 1981 corporate headquarters of parent Burlington Northern Inc. were moved to Seattle, Washington, and in 1988, after its non-rail operations were spun off as Burlington Resources, to Fort Worth, Texas.

On December 31, 1996, the Burlington Northern merged with the Atchison, Topeka and Santa Fe Railway to form the Burlington Northern and Santa Fe Railway.

[edit] Route

Main line heading north out of Seattle, Washington along the shore of Puget Sound
Enlarge
Main line heading north out of Seattle, Washington along the shore of Puget Sound

The Burlington Northern traversed the most northerly route of any railroad in the western United States. This route started at Chicago, Illinois and ran west-northwest to La Crosse, Wisconsin. From here the route continued northwest through Minneapolis and St. Paul, Minnesota to Grand Forks, North Dakota. From Grand Forks the route ran west through North Dakota, Montana, and Idaho to Spokane, Washington. At Spokane the route split into two routes, one going to Seattle, Washington and another to Portland, Oregon. This route required construction of the Flathead Tunnel through the Rocky Mountains in Montana and the Cascade Tunnel through the Cascade Mountains in Washington.

With the acquisition of the St. Louis - San Francisco Railway, the route was extended into the South Central and Southeastern United States.

[edit] Rolling stock notes

BN 3157, an EMD GP50 leads a westbound freight train past Eola yard in Aurora, Illinois.
Enlarge
BN 3157, an EMD GP50 leads a westbound freight train past Eola yard in Aurora, Illinois.

The Burlington Northern's locomotive livery painted the top quarter or so of the locomotive black and the rest green, with a white 'BN' logo. Often, the front of the locomotive was striped with white and green for visibility. In 1985, several locomotives test ran a paint alteration of orange and black stripes on the cab face and nose to raise visibility at grade crossings. At the same time, the logo and road number switched locations on the body. The "BN" herald moved to the long hood along with the words "Burlington Northern" painted in white alongside the herald on the hood of the unit. The road number moved to the panel under the side cab window where the "BN" logo normally resides.

[edit] See also

[edit] References

[edit] External links


In other languages