Alberta provincial highway 216
From Wikipedia, the free encyclopedia
Highway 216, also known as Anthony Henday Drive, is the highway designation for the current construction project of a ring road around Edmonton, Alberta. Parts of the road are already completed such as the eastern section from Highway 16 south to Highway 14, and the western and southwestern section from Highway 16 to Calgary Trail / Gateway Boulevard / Highway 2. The southeastern section is from Calgary Trail / Gateway Boulevard to Highway 14, and is also under construction, to be completed in October 2007. The southeastern section is a public-private partnership (P3 - also known as a design build project), in which Access Roads won the contract for $493 Million to build the road and maintain it for 30 years.
On the northern half of Anthony Henday Drive, construction is already under way from Highway 16, north to 137 Ave, where it will meet St. Albert's project of a regional road, bypassing the city to the west. These two parts are set to open in late 2006. As for the remainder of the route, the province has no plans for it to commence construction, yet has announced a 2011 completion of the entire ring. The rapid growth of St. Albert and the north side of Edmonton and increasing congestion on the Yellowhead Highway are spurring a push to complete the entire ring road. The completion of the northern portion of Anthony Henday Drive will also require construction of a new bridge over the North Saskatchewan River.
Contents |
[edit] Interchanges
Eventually the entire route will have freeway status, which means interchanges at all intersections to allow free-flow traffic.
[edit] Interchanges already completed:
[edit] East
- Highway 16 (will be upgraded to include third level flyover)
- Baseline Road / 101 Ave
- Sherwood Park Freeway / Wye Road
- Whitemud Drive / Highway 628
- 34 Ave flyover
[edit] West
- Highway 16 (one 2-lane bridge completed; one under construction)
- 87 Ave
- Whitemud Drive
[edit] South
- Terwillegar Drive
- 127 Street (limited access)
- 111 Street
- Calgary Trail / Gateway Blvd. / Highway 2 (Triple decker, 12 bridges)(half open)
[edit] Interchanges proposed/currently under construction:
[edit] South
- Highway 14
- 17 Street
- 34 Street flyover
- 50 Street
- 66 Street flyover
- 91 Street
- Parsons Road flyover
[edit] West
- Cameron Heights Drive
- Lessard Road
- Callingwood Road
- Stony Plain Road / 100 Ave (Highway 16A)
- 111 Ave / 109 Ave
1 | 1A | 1X | 2 | 2A | 3 | 3A | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 11A | 12 | 13 | 13A | 14 | 15 | 16 | 16A | 17 | 18 | 19 | |
20 | 20A | 21 | 22 | 22X | 23 | 24 | 25 | 26 | 27 | 28 | 28A | 30 | 31 | 32 | 33 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 41A | 42 | 43 | 44 |
45 | 47 | 49 | 50 | 52 | 53 | 54 | 55 | 56 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 64A | 66 | 68 | 69 | 72 | 88 | 93 | 93A | 100 | 201 | 216 |