Albert B. Chandler Hospital
From Wikipedia, the free encyclopedia
Opened in 1962, the Albert B. Chandler Hospital along Rose Street at the University of Kentucky in Lexington, Kentucky is a component of the University of Kentucky HealthCare, encompassed within the University of Kentucky Chandler Medical Center [1]. The 473-bed medical facility features the Markey Cancer Center, the Kentucky Children's Hospital, the Gill Heart Institute, the Kentucky Neuroscience Institute and the Center for Advanced Surgery. The hospital is the only Level I trauma center in central and eastern Kentucky, and the only facility in the region to play host to a Level III neonatal intensive care unit for infants.
The hospital also includes a 100-bed intensive care facility and 17 operating rooms.
Contents |
[edit] Future
[edit] Phase I
Under construction currently is a new parking structure for the hospital. Upon completion in 2007, the existing parking garage adjacent to the hospital will be demolished so that a new patient care facility can be constructed in its place.
Design work regarding the new facility began in August 2005 [2]. This was due to a need to modernize the hospital due to the "rapidly changing nature of health care delivery" and other advances, along with a sharp increase in patients [3]. The facility was part of a much larger project:
The new patient care facility is the first phase of an overall facilities master plan for the entire medical and research campus – one designed to meet future health care, education and research needs. Further down the road, in Phase 2 and Phase 3, we will build a facility on the site of the existing hospital where patient care providers will provide complex outpatient care, linked with inpatient services in the new patient care facility. The medical research and educational activities of the university will primarily be located west of Limestone creating a multidisciplinary learning and research environment for the colleges of the medical center. Planning is under way to further define this part of our campus. |
The $450 million [4] 1 million sq. ft. patient care facility will be constructed as a ten-floor structure [5]. There will be a four-floor base with an emergency department, radiology services, eight new operating rooms, same day surgery facilities, a post-anesthesia care unit, and a recovery area, along with a new lobby, coffee shop, gift shop, and waiting areas. Constructed above this will be two separate six-floor patient bed towers. The patient rooms will mostly be private and be very flexible, in that they can be converted into intensive-care units with ease.
The original plans called for one patient tower, but this was amended to include two because of cost savings analysis. UK Healthcare would save $10 to $12 million by constructing the second patient tower instead of adding it in on a later date. It is also advantageous because the construction plans and cranes would already be in place and that disruptions would be minimal [6].
Funding for the new patient care facility is being generated through existing hospital revenues and bond issues.
[edit] Phase II and III
During Phase II and III, the existing Chandler Hospital will be demolished in favor of a new facility for outpatient care that will be linked with inpatient services in the patient care facility constructed under Phase I [5]. Medical research and educational support structures will be relocated primarily west of South Limestone.
[edit] References
- ^ "UK Chandler Hospital Fact Sheet." 19 Oct. 2006. UK Healthcare. 17 Nov. 2006 [1]
- ^ "Construction closures will affect part of Limestone." 2005 Aug. UK Healthcare. 17 Nov. 2006 [2].
- ^ "UK Announces Design for New Hospital, Medical Campus of Future." 2006 Feb. UK Healthcare. 17 Nov. 2006 [3].
- ^ "Funding." 19 Oct. 2006. UK Healthcare. 17 Nov. 2006 [4].
- ^ a b "Timeline." 19 Oct. 2006. UK Healthcare. 17 Nov. 2006 [5].
- ^ "Growth." 19 Oct. 2006. UK Healthcare. 17 Nov. 2006 [6].